9 NW over WINCHESTER WW

9 NW .7 mile E of K NW · County 025, Washington · Built 1953 · 2 Lanes · 617 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
082232000000000
Year Built
1953
Reconstructed
1980
Length
38.7 m (127 ft)
Max Span
9.8 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
617
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,473,000
Total Project Cost
$4,946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.