M NW over West Canal
M NW 0.2 S of 11 · County 025, Washington · Built 2004 · 2 Lanes · 560 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.246611, -119.768119
This bridge is in worse condition than 18.8% of bridges in County 025. The average bridge in Washington is 0 years old; this one is 22 years old.
Nearby Bridges
11 N.W. over Wasteway
Built 2017
Farm Access/Maint. over West Canal DW229 Waste
Built 2010
Adams Rd over Lateral block 73
Built 2017
M RD NW over IRRIGATION LATERAL
Built 1952
Martin Road over Wasteway
Built 2017
Adams road over Lateral. Block 73
Built 2017
FARM ACCESS over WEST CANAL LATERAL W26C
Built 1994
N RD NW over IRRIGATION LATERAL
Built 1952
Farm Access over West Canal W26C Lateral
Built 2007
FARM ACCESS over WEST CANAL LATERAL W26C
Built 1994
Bridge Details
- Structure #
- 087145000000000
- Year Built
- 2004
- Length
- 35.1 m (115.2 ft)
- Max Span
- 34.4 m
- Width
- 11 m (36.1 ft)
- Lanes
- 2
- Daily Traffic
- 560
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,256,000
- Total Project Cost
- $4,512,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.