I-90 EB over SUNSET CREEK
0.5 E JCT I-405 · County 033, Washington · Built 2024 · 6 Lanes · 139,482 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.579825, -122.161517
This bridge is in worse condition than 5% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 2 years old.
Nearby Bridges
I-90 WB over SUNSET CREEK
Built 2024
I-90 over RICHARDS RD
Built 1940
I-90 over W-S RAMP RICHARD RD
Built 1969
I-90 over RICHARDS RD
Built 1968
I-90 W-S RAMP over I-90 MAINLINE
Built 1969
HOV ON/OFF RAMP over I-90
Built 2006
405 NE RAMP over NE RAMP OVER PED PATH
Built 2021
142ND PL SE over I-90 RAMPS CITY STREET
Built 1976
HOV ON/OFF RAMPS over I-90
Built 2006
KAMBER ROAD over RICHARDS CREEK
Built 2005
Bridge Details
- Structure #
- 0019750B0000000
- Year Built
- 2024
- Length
- 47 m (154.2 ft)
- Max Span
- 45.2 m
- Width
- 29.4 m (96.5 ft)
- Lanes
- 6
- Daily Traffic
- 139,482
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $3,529,000
- Total Project Cost
- $7,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.