I-90 EB over SUNSET CREEK

0.5 E JCT I-405 · County 033, Washington · Built 2024 · 6 Lanes · 139,482 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019750B0000000
Year Built
2024
Length
47 m (154.2 ft)
Max Span
45.2 m
Width
29.4 m (96.5 ft)
Lanes
6
Daily Traffic
139,482
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,529,000
Total Project Cost
$7,058,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.