HOV ON/OFF RAMPS over I-90

1.2 E JCT I-405 · County 033, Washington · Built 2006 · 2 Lanes · 1,266 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0016879B0000000
Year Built
2006
Length
16.2 m (53.1 ft)
Max Span
13.7 m
Width
23.5 m (77.1 ft)
Lanes
2
Daily Traffic
1,266
Material
Prestressed Concrete Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$328,000
Total Project Cost
$655,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.