HOV ON/OFF RAMPS over I-90
1.2 E JCT I-405 · County 033, Washington · Built 2006 · 2 Lanes · 1,266 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.579444, -122.151028
This bridge is in worse condition than 12.8% of bridges in County 033. The average bridge in Washington is 0 years old; this one is 20 years old.
Nearby Bridges
142ND PL SE over I-90 RAMPS CITY STREET
Built 1976
HOV ON/OFF RAMP over I-90
Built 2006
148TH ST-W RAMP over I-90 WBCD RAMP
Built 1973
RAMP over I-90 RAMPS CITY STREET
Built 1973
I-90 EB over SUNSET CREEK
Built 2024
I-90 WB over SUNSET CREEK
Built 2024
150TH AVE SE over I-90
Built 1973
150TH AVE SE over I-90
Built 1973
KAMBER ROAD over RICHARDS CREEK
Built 2005
I-90 over RICHARDS RD
Built 1968
Bridge Details
- Structure #
- 0016879B0000000
- Year Built
- 2006
- Length
- 16.2 m (53.1 ft)
- Max Span
- 13.7 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 2
- Daily Traffic
- 1,266
- Material
- Prestressed Concrete Continuous
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $328,000
- Total Project Cost
- $655,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.