HOV ON/OFF RAMP over I-90

1.2 E JCT I-405 · County 033, Washington · Built 2006 · 2 Lanes · 583 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0016879A0000000
Year Built
2006
Length
49.1 m (161.1 ft)
Max Span
10.1 m
Width
22.2 m (72.8 ft)
Lanes
2
Daily Traffic
583
Material
Prestressed Concrete Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$994,000
Total Project Cost
$1,988,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.