I-90 W-S RAMP over I-90 MAINLINE

JCT I-405 · County 033, Washington · Built 1969 · 1 Lanes · 15,468 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008190E0000000
Year Built
1969
Length
141.4 m (463.9 ft)
Max Span
44.5 m
Width
8.1 m (26.6 ft)
Lanes
1
Daily Traffic
15,468
Material
Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,755,000
Total Project Cost
$5,510,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.