W-N RAMP TO I-405 over S-W RAMP TO I-90

0.1 E JCT I-405 · County 033, Washington · Built 1968 · 1 Lanes · 22,417 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008190C0000000
Year Built
1968
Length
64 m (210 ft)
Max Span
21.6 m
Width
8 m (26.2 ft)
Lanes
1
Daily Traffic
22,417
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,346,000
Total Project Cost
$2,693,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.