I-405 over I-90

5.7 N JCT SR 900 · County 033, Washington · Built 2008 · 3 Lanes · 48,783 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0017283A0000000
Year Built
2008
Length
272.2 m (893 ft)
Max Span
49.1 m
Width
18 m (59.1 ft)
Lanes
3
Daily Traffic
48,783
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,301,000
Total Project Cost
$24,602,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.