I-405 RAMP over EB I-90 RAMP

5.7 N JCT SR 900 · County 033, Washington · Built 1969 · 2 Lanes · 36,070 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008190H0000000
Year Built
1969
Length
25 m (82 ft)
Max Span
23.5 m
Width
11.1 m (36.4 ft)
Lanes
2
Daily Traffic
36,070
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$701,000
Total Project Cost
$1,402,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.