US 395 OFF RAMP over BNSF RR

3.6 N JCT I-90 · County 063, Washington · Built 2023 · 1 Lanes · 6,253 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019587B0000000
Year Built
2023
Length
46.6 m (152.9 ft)
Max Span
46.6 m
Width
7.8 m (25.6 ft)
Lanes
1
Daily Traffic
6,253
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,013,000
Total Project Cost
$4,026,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.