NB US 395 SPUR NSC over GERLACH RD
5.7 N JCT I-90 · County 063, Washington · Built 2008 · 3 Lanes · 6,253 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.735, -117.35875
This bridge is in worse condition than 5.2% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 18 years old.
Nearby Bridges
US 395 over GERLACH RD
Built 2012
US 395 SPUR NSC over LINCOLN RD
Built 2012
NB US 395 over LINCOLN RD
Built 2008
US 395 over FAIRVIEW RD
Built 2012
NB US 395 over FAIRVIEW RD
Built 2009
US 395 over BNSF RR
Built 2009
US 395 over MARKET ST
Built 2012
US 395 over BNSF RR
Built 2015
E-S RAMP over MARKET STREET
Built 2012
SR 395 over BNSF RR
Built 2015
Bridge Details
- Structure #
- 0017278B0000000
- Year Built
- 2008
- Length
- 33.2 m (108.9 ft)
- Max Span
- 31.6 m
- Width
- 18.2 m (59.7 ft)
- Lanes
- 3
- Daily Traffic
- 6,253
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,502,000
- Total Project Cost
- $3,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.