NB US 395 SPUR NSC over GERLACH RD

5.7 N JCT I-90 · County 063, Washington · Built 2008 · 3 Lanes · 6,253 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

47.735, -117.35875

This bridge is in worse condition than 5.2% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 18 years old.

Nearby Bridges

Bridge Details

Structure #
0017278B0000000
Year Built
2008
Length
33.2 m (108.9 ft)
Max Span
31.6 m
Width
18.2 m (59.7 ft)
Lanes
3
Daily Traffic
6,253
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,502,000
Total Project Cost
$3,003,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.