SR 395 over BNSF RR
4.6 N JCT I-90 · County 063, Washington · Built 2015 · 5 Lanes · 6,253 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
47.717611, -117.361778
This bridge is in worse condition than 18.1% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 11 years old.
Nearby Bridges
US 395 over BNSF RR
Built 2015
E FRANCIS AVENUE over FUTURE US 395/RR/PED
Built 2013
US 395 SPUR NSC over LINCOLN RD
Built 2012
NB US 395 over LINCOLN RD
Built 2008
US 395 W-N RAMP over BNSF RR
Built 2023
US 395 OFF RAMP over BNSF RR
Built 2023
US 395 over GERLACH RD
Built 2012
NB US 395 SPUR NSC over GERLACH RD
Built 2008
US 395 over FAIRVIEW RD
Built 2012
NB US 395 over FAIRVIEW RD
Built 2009
Bridge Details
- Structure #
- 0018496A0000000
- Year Built
- 2015
- Length
- 48.9 m (160.4 ft)
- Max Span
- 46.5 m
- Width
- 34.2 m (112.2 ft)
- Lanes
- 5
- Daily Traffic
- 6,253
- Material
- Prestressed Concrete
- Design
- Girder and Floorbeam System
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,741,000
- Total Project Cost
- $5,482,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.