E FRANCIS AVENUE over FUTURE US 395/RR/PED
4.6 N JCT I-90 · County 063, Washington · Built 2013 · 5 Lanes · 15,600 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.714944, -117.363556
This bridge is in worse condition than 5.2% of bridges in County 063. The average bridge in Washington is 0 years old; this one is 13 years old.
Nearby Bridges
SR 395 over BNSF RR
Built 2015
US 395 over BNSF RR
Built 2015
US 395 W-N RAMP over BNSF RR
Built 2023
US 395 OFF RAMP over BNSF RR
Built 2023
US 395 SPUR NSC over LINCOLN RD
Built 2012
NB US 395 over LINCOLN RD
Built 2008
US 395 over GERLACH RD
Built 2012
NB US 395 SPUR NSC over GERLACH RD
Built 2008
US 395 over FAIRVIEW RD
Built 2012
NB US 395 over FAIRVIEW RD
Built 2009
Bridge Details
- Structure #
- 0018296A0000000
- Year Built
- 2013
- Length
- 138.7 m (455.1 ft)
- Max Span
- 40.5 m
- Width
- 31.7 m (104 ft)
- Lanes
- 5
- Daily Traffic
- 15,600
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $8,969,000
- Total Project Cost
- $17,938,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.