US 395 W-N RAMP over BNSF RR

3.6 N JCT I-90 · County 063, Washington · Built 2023 · 1 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
0019587A0000000
Year Built
2023
Length
50.9 m (167 ft)
Max Span
49 m
Width
7.9 m (25.9 ft)
Lanes
1
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,186,000
Total Project Cost
$4,372,000