SR 3 over CHICO CREEK
6.1 N JCT SR 304 · County 035, Washington · Built 2024 · 6 Lanes · 30,680 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
47.600989, -122.705278
This bridge is in worse condition than 25.8% of bridges in County 035. The average bridge in Washington is 0 years old; this one is 2 years old.
Nearby Bridges
SR 3 over CHICO WAY NW
Built 1971
SR 3 over CHICO WAY NW
Built 1971
NW ERLAND POINT RD over CHICO CREEK
Built 1997
SR 3 over ERLAND POINT RD
Built 1966
SR 3 over ERLAND POINT RD
Built 1966
GOLF CLUB HILL RD over CHICO CREEK
Built 2019
CHICO WAY NW over CHICO CREEK
Built 2009
ELDORADO BLVD over SR 3
Built 1972
NORTHLAKE WAY NW over CHICO CREEK
Built 1997
NW TAYLOR ROAD over DICKERSON CREEK
Built 2016
Bridge Details
- Structure #
- 0019475A0000000
- Year Built
- 2024
- Length
- 67.4 m (221.1 ft)
- Max Span
- 65.8 m
- Width
- 30.8 m (101 ft)
- Lanes
- 6
- Daily Traffic
- 30,680
- Material
- Prestressed Concrete
- Design
- Box Beam or Girders - Multiple
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,624,000
- Total Project Cost
- $5,249,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.