ELDORADO BLVD over SR 3
7.2 N JCT SR 304 · County 035, Washington · Built 1972 · 2 Lanes · 1,208 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.615703, -122.712003
This bridge is in worse condition than 25.8% of bridges in County 035. The average bridge in Washington is 0 years old; this one is 54 years old.
Nearby Bridges
SR 3 over CHICO WAY NW
Built 1971
SR 3 over CHICO WAY NW
Built 1971
SR 3 over CHICO CREEK
Built 2024
NW ERLAND POINT RD over CHICO CREEK
Built 1997
SR 3 over ERLAND POINT RD
Built 1966
SR 3 over ERLAND POINT RD
Built 1966
SR 3 over NEWBERRY HILL RD
Built 1972
SR 3 over NEWBERRY HILL RD
Built 1972
GOLF CLUB HILL RD over CHICO CREEK
Built 2019
CHICO WAY NW over CHICO CREEK
Built 2009
Bridge Details
- Structure #
- 0009269A0000000
- Year Built
- 1972
- Length
- 102.1 m (335 ft)
- Max Span
- 32.3 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 1,208
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,944,000
- Total Project Cost
- $5,888,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.