SR 3 over ERLAND POINT RD
5.6 N JCT SR 304 · County 035, Washington · Built 1966 · 2 Lanes · 29,466 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
47.596708, -122.699097
This bridge is in worse condition than 25.8% of bridges in County 035. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
SR 3 over ERLAND POINT RD
Built 1966
NW ERLAND POINT RD over CHICO CREEK
Built 1997
SR 3 over CHICO CREEK
Built 2024
GOLF CLUB HILL RD over CHICO CREEK
Built 2019
CHICO WAY NW over CHICO CREEK
Built 2009
SR 3 over CHICO WAY NW
Built 1971
SR 3 over CHICO WAY NW
Built 1971
NORTHLAKE WAY NW over CHICO CREEK
Built 1997
AUSTIN DRIVE over SR 3
Built 1966
NW TAYLOR ROAD over DICKERSON CREEK
Built 2016
Bridge Details
- Structure #
- 0007883B0000000
- Year Built
- 1966
- Length
- 49 m (160.8 ft)
- Max Span
- 17.1 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 29,466
- Material
- Prestressed Concrete Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,602,000
- Total Project Cost
- $3,204,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.