SR 3 over CHICO WAY NW

6.3 N JCT SR 304 · County 035, Washington · Built 1971 · 2 Lanes · 28,125 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
0008976B0000000
Year Built
1971
Length
63.4 m (208 ft)
Max Span
25.3 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
28,125
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,075,000
Total Project Cost
$4,150,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.