GOLF CLUB HILL RD over CHICO CREEK

85 FT E OF CHICO WAY · County 035, Washington · Built 2019 · 2 Lanes · 696 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
089123000000000
Year Built
2019
Length
43.3 m (142.1 ft)
Max Span
42.1 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
696
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,012,000
Total Project Cost
$2,024,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.