SR 20 over SHIP HBR/GUEMES CHANNEL

7.8N ON SR20 SPUR · County 057, Washington · Built 1971 · 2 Lanes · 3,227 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
0016178A0000000
Year Built
1971
Reconstructed
2002
Length
32 m (105 ft)
Max Span
24.4 m
Width
7.3 m (24 ft)
Lanes
2
Daily Traffic
3,227
Material
Steel
Design
Movable - Lift
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$674,000
Total Project Cost
$1,347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.