SR 20 over SHIP HBR/GUEMES CHANNEL

7.8N ON SR20 SPUR · County 057, Washington · Built 1971 · 2 Lanes · 3,227 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
0008985B0000000
Year Built
1971
Length
62.2 m (204.1 ft)
Max Span
5.2 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
3,227
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,163,000
Total Project Cost
$2,326,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.