MARCH POINT ROAD over PETROLEUM PIPELINES

1.6 N JCT SR 20 · County 057, Washington · Built 1960 · 2 Lanes · 678 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
084366000000000
Year Built
1960
Length
13.5 m (44.3 ft)
Max Span
4.3 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
678
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$980,000
Total Project Cost
$1,960,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.