SR 20 over SHIP HBR/GUEMES CHANNEL

7.8N ON SR20 SPUR · County 057, Washington · Built 1959 · 2 Lanes · 3,227 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
0008985D0000000
Year Built
1959
Length
48.2 m (158.1 ft)
Max Span
5.8 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
3,227
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,176,000
Total Project Cost
$4,353,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.