SR 20 over SHIP HBR/GUEMES CHANNEL
7.8N ON SR20 SPUR · County 057, Washington · Built 1959 · 2 Lanes · 3,227 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
7
Good
Superstructure
4
Poor
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 4 | Poor |
| Substructure | 6 | Satisfactory |
Location
48.506708, -122.678017
This bridge is in worse condition than 97.7% of bridges in County 057. The average bridge in Washington is 0 years old; this one is 67 years old.
Nearby Bridges
SR 20 over SHIP HBR/GUEMES CHANNEL
Built 1971
EXTENSION OF SR 20 over UPRIGHT CHANNEL
Built 1981
SR 20 over SHIP HBR/GUEMES CHANNEL
Built 1959
SR 20 over SHIP HBR/GUEMES CHANNEL
Built 1971
I AVENUE over GUEMES CHANNEL
Built 1925
GUEMES ISLAND ROAD over GUEMES CHANNEL
Built 1981
MARCH POINT ROAD over PETROLEUM PIPELINES
Built 1960
SR 20 over MEADOW CREEK
Built 2008
SR 20 over CANOE PASS
Built 1935
SR 20 over ABANDONED RR
Built 1962
Bridge Details
- Structure #
- 0008985A0000000
- Year Built
- 1959
- Reconstructed
- 1994
- Length
- 32 m (105 ft)
- Max Span
- 24.4 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 3,227
- Material
- Steel
- Design
- Movable - Lift
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $674,000
- Total Project Cost
- $1,347,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.