SR 21 over DRY COULEE

1.3 N JCT SR 260 · County 021, Washington · Built 1963 · 2 Lanes · 165 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Condition Ratings

ComponentRatingDescription
Deck 8 Very Good
Superstructure 8 Very Good
Substructure 8 Very Good

Location

46.660214, -118.547858

This bridge is in worse condition than 3% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
0007173A0000000
Year Built
1963
Length
15.8 m (51.8 ft)
Max Span
6.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
165
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$370,000
Total Project Cost
$741,000