HATTON RD over DRY RELIEF
00.99 MI W SR21 · County 001, Washington · Built 1927 · 2 Lanes · 21 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
46.765581, -118.567878
This bridge is in worse condition than 36.4% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 99 years old.
Nearby Bridges
SR 21 over INTERMITTENT STREAM
Built 1981
HAMPTON RD over DRY RELIEF
Built 1952
WAHL RD over DRY RELIEF
Built 1950
SR 26 over NEDWICKES ARROYO
Built 1960
SR 26 over DRY WASH
Built 1960
HAMPTON RD over DRY RELIEF
Built 1900
SR 21 over DRY COULEE
Built 1963
SR 21 over DRY COULLEE
Built 1963
CUNNINGHAM RD over INTERMITTENT STREAM
Built 1958
SR 21 over DRY COULEE
Built 1950
Bridge Details
- Structure #
- 083776000000000
- Year Built
- 1927
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 21
- Material
- Concrete
- Design
- Girder and Floorbeam System
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $848,000
- Total Project Cost
- $1,697,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.