SR 21 over INTERMITTENT STREAM
2.9 N FRANKLIN CO · County 001, Washington · Built 1981 · 2 Lanes · 165 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.777506, -118.547333
This bridge is in worse condition than 36.4% of bridges in County 001. The average bridge in Washington is 0 years old; this one is 45 years old.
Nearby Bridges
HAMPTON RD over DRY RELIEF
Built 1952
HATTON RD over DRY RELIEF
Built 1927
SR 26 over NEDWICKES ARROYO
Built 1960
WAHL RD over DRY RELIEF
Built 1950
SR 26 over DRY WASH
Built 1960
HAMPTON RD over DRY RELIEF
Built 1900
SR 21 over DRY COULEE
Built 1963
SR 21 over DRY COULLEE
Built 1963
CUNNINGHAM RD over INTERMITTENT STREAM
Built 1958
SR 21 over DRY COULEE
Built 1950
Bridge Details
- Structure #
- 000000QR0000000
- Year Built
- 1981
- Length
- 12.8 m (42 ft)
- Max Span
- 12.8 m
- Width
- 9.8 m (32.2 ft)
- Lanes
- 2
- Daily Traffic
- 165
- Material
- Prestressed Concrete
- Design
- Channel Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $339,000
- Total Project Cost
- $678,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.