SR 21 over DRY COULEE

3.6 N JCT SR 260 · County 021, Washington · Built 1963 · 2 Lanes · 165 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

46.689583, -118.529183

This bridge is in worse condition than 56.4% of bridges in County 021. The average bridge in Washington is 0 years old; this one is 63 years old.

Nearby Bridges

Bridge Details

Structure #
0007173D0000000
Year Built
1963
Length
24.4 m (80.1 ft)
Max Span
11.9 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
165
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$532,000
Total Project Cost
$1,064,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.