SPILLWAY BRIDGE over SPILLWAY CHANNEL
LOWER MONUMENTAL DAM · County 071, Washington · Built 1966 · 2 Lanes · 50 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
46.561, -118.536303
This bridge is in worse condition than 62.6% of bridges in County 071. The average bridge in Washington is 0 years old; this one is 60 years old.
Nearby Bridges
Bridge Details
- Structure #
- CEPNPWWA0LMASPY
- Year Built
- 1966
- Length
- 156 m (511.8 ft)
- Max Span
- 15.2 m
- Width
- 7 m (23 ft)
- Lanes
- 2
- Daily Traffic
- 50
- Material
- Concrete
- Design
- Box Beam or Girders - Single or Spread
- Owner
- Corps of Engineers (Civil)
- Last Inspected
- N/A
- Est. Improvement
- $502,000
- Total Project Cost
- $753,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.