SR 20 over SIDEHILL
8.6 E SKAGIT CO · County 073, Washington · Built 1962 · 2 Lanes · 848 vehicles/day
Overall
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
48.705703, -121.175861
This bridge is in worse condition than 11.5% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
SR 20 over SKAGIT R
Built 1960
DIABLO ST over STETATTLE CREEK
Built 1941
SR 20 over GORGE CREEK
Built 1955
DIABLO CAMP ROAD over DIABLO TAILRACE
Built 1962
SR 20 over HALF BR STA 163
Built 1962
DIABLO DAM RD over DIABLO GORGE
Built 1962
DIABLO ACCESS RD over DIABLO GORGE
Built 1962
DIABLO ACCESS ROAD over SKAGIT RIVER
Built 1930
DIABLO DAM ACCESS over SKAGIT RIVER
Built 1930
DIABLO DAM ACCESS over SKAGIT RIVER
Built 1930
Bridge Details
- Structure #
- 0006974E0000000
- Year Built
- 1962
- Length
- 25 m (82 ft)
- Max Span
- 12.2 m
- Width
- 5 m (16.4 ft)
- Lanes
- 2
- Daily Traffic
- 848
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $642,000
- Total Project Cost
- $1,285,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.