DIABLO ACCESS ROAD over SKAGIT RIVER

Diable Dam · County 033, Washington · Built 1930 · 2 Lanes · 220 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
087471000000000
Year Built
1930
Length
53.3 m (174.9 ft)
Max Span
6.4 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
220
Material
Concrete
Design
Slab
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$873,000
Total Project Cost
$1,746,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.