DIABLO CAMP ROAD over DIABLO TAILRACE

Diablo Powerhouse · County 033, Washington · Built 1962 · 1 Lanes · 205 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
087459000000000
Year Built
1962
Length
34.1 m (111.9 ft)
Max Span
15.8 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
205
Material
Steel
Design
Girder and Floorbeam System
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$452,000
Total Project Cost
$904,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.