DIABLO ST over STETATTLE CREEK

Diable Bunkhouse Entrance · County 033, Washington · Built 1941 · 1 Lanes · 300 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
087458000000000
Year Built
1941
Length
29 m (95.1 ft)
Max Span
27.1 m
Width
4.3 m (14.1 ft)
Lanes
1
Daily Traffic
300
Material
Steel
Design
Truss - Thru
Owner
Other Local Agencies
Last Inspected
N/A
Est. Improvement
$496,000
Total Project Cost
$993,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.