SR 20 over HALF BR STA 163
6.1 E SKAGIT CO · County 073, Washington · Built 1962 · 2 Lanes · 1,696 vehicles/day
Overall
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
48.697478, -121.215586
This bridge is in worse condition than 76.6% of bridges in County 073. The average bridge in Washington is 0 years old; this one is 64 years old.
Nearby Bridges
SR 20 over GORGE CREEK
Built 1955
SR 20 over HALF BR STA 155
Built 1900
SR 20 over SIDEHILL
Built 1962
NEWHALEM PH ROAD over NEWHALEM CREEK
Built 1968
NEWHALEM CAMPGROUN over SKAGIT RIVER
Built 1958
SR 20 over GOODELL CREEK
Built 1972
SR 20 over SKAGIT R
Built 1960
DIABLO ST over STETATTLE CREEK
Built 1941
DIABLO CAMP ROAD over DIABLO TAILRACE
Built 1962
DIABLO DAM RD over DIABLO GORGE
Built 1962
Bridge Details
- Structure #
- 0006974C0000000
- Year Built
- 1962
- Length
- 23.8 m (78.1 ft)
- Max Span
- 23.2 m
- Width
- 3.6 m (11.8 ft)
- Lanes
- 2
- Daily Traffic
- 1,696
- Material
- Concrete
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $482,000
- Total Project Cost
- $963,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.