RTE. 234 NBL over NS RAILWAY

01.30FRCLOVER/00.42TO 28 · County 153, Virginia · Built 1999 · 2 Lanes · 19,776 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000025753
Year Built
1999
Length
68 m (223.1 ft)
Max Span
25.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
19,776
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$59,000,000
Total Project Cost
$175,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.