RTE. 234 SBL over GATEWAY BLVD

0.30FR28/1.50TO3235 · County 153, Virginia · Built 1999 · 2 Lanes · 19,776 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000025750
Year Built
1999
Length
46.9 m (153.9 ft)
Max Span
46.9 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
19,776
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$3,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.