234 CONNECTOR C over ROUTES 28 & 234

00.30FR28/00.40TO234 · County 153, Virginia · Built 1997 · 1 Lanes · 17,236 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000024792
Year Built
1997
Length
257.6 m (845.1 ft)
Max Span
74.7 m
Width
10.2 m (33.5 ft)
Lanes
1
Daily Traffic
17,236
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$68,000,000
Total Project Cost
$175,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.