RTE. 234 NBL over RTE.28 NOKESVILLE RD.

01.70FRCLOVER/02.20TO674 · County 153, Virginia · Built 1999 · 3 Lanes · 19,776 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000000025751
Year Built
1999
Length
58.5 m (191.9 ft)
Max Span
29.3 m
Width
16.9 m (55.4 ft)
Lanes
3
Daily Traffic
19,776
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$231,000,000
Total Project Cost
$255,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.