RTE. 234 SBL over NS RAILWAY

00.42FR28/00.61TOCLOVER H · County 153, Virginia · Built 1999 · 4 Lanes · 19,776 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000000025752
Year Built
1999
Length
68 m (223.1 ft)
Max Span
25.9 m
Width
20.5 m (67.3 ft)
Lanes
4
Daily Traffic
19,776
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$57,000,000
Total Project Cost
$176,000,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.