I 00089 ML over I 89 OVER TH NO 8

0.6 MI N EXIT 11 · County 007, Vermont · Built 1962 · 2 Lanes · 36,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
200089059S04112
Year Built
1962
Length
46.3 m (151.9 ft)
Max Span
15.8 m
Width
10.7 m (35.1 ft)
Lanes
2
Daily Traffic
36,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,862,000
Total Project Cost
$1,912,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.