I 00089 ML over I 89 OVER WIN. RIV.+TH16

0.3 MI N EXIT 11 · County 007, Vermont · Built 1962 · 2 Lanes · 36,300 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
200089058N04112
Year Built
1962
Length
170.1 m (558.1 ft)
Max Span
70.1 m
Width
10.8 m (35.4 ft)
Lanes
2
Daily Traffic
36,300
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,933,000
Total Project Cost
$6,983,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.