C3033 over DONAHUE BROOK
0.27 MI TO JCT W CL2 TH4 · County 007, Vermont · Built 1934 · 2 Lanes · 350 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.418275, -72.989769
This bridge is in worse condition than 49.5% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 92 years old.
Nearby Bridges
I 00089 ML over I 89 OVER TH NO 4
Built 1964
I 00089 ML over I 89 OVER TH NO 4
Built 1964
I 00089 ML over I 89 OVER US 2
Built 1964
I 00089 ML over I 89 OVER US 2
Built 1964
I 00089 ML over I 89 OVER NECRR & BROOK
Built 1964
I 00089 ML over I 89 OVER NECRR & BROOK
Built 1964
US 00002 ML over US 2 OVER NECRR
Built 1938
TR 01 FAS 209 over WINOOSKI RIVER
Built 1928
US 00002 ML over I 89 UNDER US 2
Built 2024
US 00002 ML over WINOOSKI RIVER
Built 1929
Bridge Details
- Structure #
- 100411000704111
- Year Built
- 1934
- Length
- 10.1 m (33.1 ft)
- Max Span
- 9.4 m
- Width
- 7.1 m (23.3 ft)
- Lanes
- 2
- Daily Traffic
- 350
- Material
- Concrete
- Design
- Tee Beam
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $270,000
- Total Project Cost
- $320,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.