TR 01 FAS 209 over WINOOSKI RIVER
0.3 MI S JCT. U.S.2 · County 007, Vermont · Built 1928 · 2 Lanes · 5,500 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
44.401183, -72.996881
This bridge is in worse condition than 49.5% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 98 years old.
Nearby Bridges
US 00002 ML over I 89 UNDER US 2
Built 2024
I 00089 ML over I 89 OVER TH NO 4
Built 1964
I 00089 ML over I 89 OVER TH NO 4
Built 1964
C3033 over DONAHUE BROOK
Built 1934
I 00089 ML over I 89 OVER US 2
Built 1964
I 00089 ML over I 89 OVER NECRR & BROOK
Built 1964
I 00089 ML over I 89 OVER US 2
Built 1964
I 00089 ML over I 89 OVER NECRR & BROOK
Built 1964
US 00002 ML over US 2 OVER NECRR
Built 1938
I 00089 ML over I 89 OVER WIN. RIV.+TH16
Built 1962
Bridge Details
- Structure #
- 200209003104112
- Year Built
- 1928
- Reconstructed
- 2009
- Length
- 72.5 m (237.9 ft)
- Max Span
- 70.7 m
- Width
- 6.5 m (21.3 ft)
- Lanes
- 2
- Daily Traffic
- 5,500
- Material
- Steel
- Design
- Truss - Thru
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,783,000
- Total Project Cost
- $1,833,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.