I 00089 ML over I 89 OVER US 2

I 89 EXIT 11 · County 007, Vermont · Built 1964 · 3 Lanes · 28,200 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
200089056N04112
Year Built
1964
Length
70.7 m (232 ft)
Max Span
29.3 m
Width
14.3 m (46.9 ft)
Lanes
3
Daily Traffic
28,200
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,816,000
Total Project Cost
$3,866,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.