I 00089 ML over I 89 OVER TH NO 8
0.6 MI N EXIT 11 · County 007, Vermont · Built 1962 · 2 Lanes · 36,300 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
44.422117, -73.021386
This bridge is in worse condition than 49.5% of bridges in County 007. The average bridge in Vermont is 0 years old; this one is 64 years old.
Nearby Bridges
I 00089 ML over I 89 OVER TH NO 8
Built 1962
I 00089 ML over I 89 OVER WIN. RIV.+TH16
Built 1962
I 00089 ML over I 89 OVER WIN. RIV.+TH16
Built 1962
US 00002 ML over WINOOSKI RIVER
Built 1929
US 00002 ML over US 2 OVER NECRR
Built 1938
I 00089 ML over I 89 OVER NECRR & BROOK
Built 1964
I 00089 ML over I 89 OVER NECRR & BROOK
Built 1964
I 00089 ML over I 89 OVER US 2
Built 1964
I 00089 ML over I 89 OVER US 2
Built 1964
C3033 over DONAHUE BROOK
Built 1934
Bridge Details
- Structure #
- 200089059N04112
- Year Built
- 1962
- Length
- 46.3 m (151.9 ft)
- Max Span
- 15.8 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 36,300
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,862,000
- Total Project Cost
- $1,912,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.