PGBT over S FK HACKBERRY CR
0.40 MI SW OF GATEWAY · County 113, Texas · Built 1994 · 15 Lanes · 10,000 vehicles/day
Overall
Culvert
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 6 | Satisfactory |
Location
32.885325, -96.985231
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 32 years old.
Nearby Bridges
BELT LINE RD over S FORK HACKBERRY CREEK
Built 1974
Gateway Dr over Drainage Ditch
Built 1978
PGBT NBML over GATEWAY DRIVE
Built 2001
PGBT SBML over GATEWAY DRIVE
Built 2001
BELT LINE RD SB over SH 161
Built 1992
BELT LINE RD NB over SH 161
Built 1992
Meadow Crk Circle over Drainage Ditch
Built 1975
High Point Dr over Drainage Channel
Built 1984
SH 114 West T/A over SH 114
Built 2013
SH 114 WBFR T/A over SH 114
Built 1993
Bridge Details
- Structure #
- 180570296401563
- Year Built
- 1994
- Length
- 18.3 m (60 ft)
- Max Span
- 3 m
- Lanes
- 15
- Daily Traffic
- 10,000
- Material
- Concrete
- Design
- Culvert
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.