Gateway Dr over Drainage Ditch
0.1 Mi SE of PGBT · County 113, Texas · Built 1978 · 4 Lanes · 11,148 vehicles/day
Overall
Culvert
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Culvert | 7 | Good |
Location
32.888942, -96.980478
This bridge is in worse condition than 28.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 48 years old.
Nearby Bridges
PGBT NBML over GATEWAY DRIVE
Built 2001
PGBT SBML over GATEWAY DRIVE
Built 2001
PGBT over S FK HACKBERRY CR
Built 1994
High Point Dr over Drainage Channel
Built 1984
SH 114 West T/A over SH 114
Built 2013
SH 114 WBFR T/A over SH 114
Built 1993
SH 161 SBFR over SH 114
Built 1973
SH 161 NBFR over SH 114
Built 1993
SH 114 EB Off-Ramp over SH 114 EB On-Ramp
Built 1987
BELT LINE RD over S FORK HACKBERRY CREEK
Built 1974
Bridge Details
- Structure #
- 180570D03315001
- Year Built
- 1978
- Length
- 16.5 m (54.1 ft)
- Max Span
- 3 m
- Lanes
- 4
- Daily Traffic
- 11,148
- Material
- Concrete
- Design
- Culvert
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $5,000
- Total Project Cost
- $6,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.