PGBT NBML over GATEWAY DRIVE
0.65 MI SW OF SH 114 · County 113, Texas · Built 2001 · 5 Lanes · 61,081 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
32.8896, -96.981164
This bridge is in worse condition than 57.9% of bridges in County 113. The average bridge in Texas is 0 years old; this one is 25 years old.
Nearby Bridges
PGBT SBML over GATEWAY DRIVE
Built 2001
Gateway Dr over Drainage Ditch
Built 1978
PGBT over S FK HACKBERRY CR
Built 1994
High Point Dr over Drainage Channel
Built 1984
SH 114 West T/A over SH 114
Built 2013
SH 114 WBFR T/A over SH 114
Built 1993
BELT LINE RD over S FORK HACKBERRY CREEK
Built 1974
SH 161 SBFR over SH 114
Built 1973
SH 161 NBFR over SH 114
Built 1993
SH 114 EB Off-Ramp over SH 114 EB On-Ramp
Built 1987
Bridge Details
- Structure #
- 180570296401564
- Year Built
- 2001
- Length
- 82.3 m (270 ft)
- Max Span
- 27.4 m
- Width
- 25 m (82 ft)
- Lanes
- 5
- Daily Traffic
- 61,081
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Local Toll Authority
- Last Inspected
- N/A
- Est. Improvement
- $0
- Total Project Cost
- $0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.