PGBT SBML over GATEWAY DRIVE

0.65 MI SW OF SH 114 · County 113, Texas · Built 2001 · 5 Lanes · 61,081 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570296401565
Year Built
2001
Length
82.3 m (270 ft)
Max Span
27.4 m
Width
25 m (82 ft)
Lanes
5
Daily Traffic
61,081
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Local Toll Authority
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.