BELT LINE RD SB over SH 161

1.70 MI SW OF SH 114 · County 113, Texas · Built 1992 · 4 Lanes · 30,793 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
180570296401063
Year Built
1992
Length
164.6 m (540 ft)
Max Span
51.8 m
Width
24.7 m (81 ft)
Lanes
4
Daily Traffic
30,793
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.